TAI’s TOW System

Twos Scene 3

Overview

TOWS Process

 

Solution Benefits

 

Objectives

  • Cost Effective—Low $/kWh compared to other systems
  • Safety and ease of installation and maintenance
  • The Buoyant Tower substructure is proven technology based on oil and gas Spar platform
  • The design is flexible in terms of water depth and environment

Innovation & Impact

The TOWS solves the following key problems in deep water in wind turbine installations:

  • Provides a safe, reliable, low cost deep water platform which is cheaper to build, install, and maintain
  • Provides a platform which is scalable to larger turbines and deeper water (up to 300m)

Key techno-economic challenges being solved:

  • Varying depth tower design using ballast
  • Flexible control system design which can be quickly adapted between different environmental conditions; tower, nacelle, and blade configurations
  • Design of installation vessel which is flexible to support different offshore installations
  • Design and analysis of taut guy mooring system
  • Cost model development for various payloads (Wind Turbines) and water depths

Key Facts

  • Tower is designed to be towed out in one piece
  • Lower mass than a TLB, Spar-Buoy, or a Semi-Submersible
  • Estimated each install offshore can be completed in less than one week
  • Can be performed in an assembly line fashion
  • TAI’s patented technology

TAI TOWS Brochure

 

 

 

 

Scroll to Top