TAI’s TOW System
Overview
TOWS Process
Solution Benefits
Objectives
- Cost Effective—Low $/kWh compared to other systems
- Safety and ease of installation and maintenance
- The Buoyant Tower substructure is proven technology based on oil and gas Spar platform
- The design is flexible in terms of water depth and environment
Innovation & Impact
The TOWS solves the following key problems in deep water in wind turbine installations:
- Provides a safe, reliable, low cost deep water platform which is cheaper to build, install, and maintain
- Provides a platform which is scalable to larger turbines and deeper water (up to 300m)
Key techno-economic challenges being solved:
- Varying depth tower design using ballast
- Flexible control system design which can be quickly adapted between different environmental conditions; tower, nacelle, and blade configurations
- Design of installation vessel which is flexible to support different offshore installations
- Design and analysis of taut guy mooring system
- Cost model development for various payloads (Wind Turbines) and water depths
Key Facts
- Tower is designed to be towed out in one piece
- Lower mass than a TLB, Spar-Buoy, or a Semi-Submersible
- Estimated each install offshore can be completed in less than one week
- Can be performed in an assembly line fashion
- TAI’s patented technology
TAI TOWS Brochure